Widespread interventions

Find out about the interventions that involve different areas of the city or are spread across different locations.

Risultati di ricerca

Advanced filters

Redevelopment of Villa Ada - Extraordinary maintenance of the Park's avenues

Implementing party

Roma Capitale

Project description

The intervention in question, financed with municipal funds, involved the renovation of a key avenue of the park, namely Viale Don Luigi di Liegro,, which connects the upper and lower parts of the park. The affected area was uneven due to the presence of incorrect plantings dating back to the 1970s' and the flow of torrents of water that violently flow into the reservoir formed by the avenue.

Activities involved:

  • the construction of substantial natural engineering works upstream to curb the convergence of water downstream;
  • the construction of the sewage system for the disposal of water in the channel below;
  • the reconstruction of the path in sanpietrini.

The second part of the intervention involved the improvement of the entrance plaza accessible from Via Salaria 267, which leads to the Egyptian Embassy and the Church of Divine Love.

Status

Planning
Tender stage
Site
End of Work

Funding source

Roma Capitale Budget

Amount allocated

591.000,00 €