Extraordinary maintenance of the paving of the quays of the Tiber, right and left bank
Implementing party
Project description
The project involves the redevelopment of the left and right quays of the Tiber in the section between Ponte Pietro Nenni and Ponte Sublicio. Currently, the riverbanks are degraded, with cobblestone pavement showing several potholes or worn surfaces. Additionally, the edges of the quays are often uneven due to the root systems of abundant invasive vegetation along the bank. The intervention will therefore involve repairing and replacing damaged pavements (travertine slabs, cobblestones), restoring uneven edges, and protecting the vegetation by removing roots.
Status
Planning
Tender stage
Site
End of Work
Estimated completion date
Second Quarter 2026
Funding source
Jubilee
Amount allocated
3.000.000,00 €