Widespread interventions

Find out about the interventions that involve different areas of the city or are spread across different locations.

Risultati di ricerca

Advanced filters

Securing of two Public Residential Buildings: building at Via Flaubert 56

Implementing party

Roma Capitale

Department for the Enhancement of Heritage and Housing Policies

Project description

The project involves the redevelopment, following fires, of two Public Residential Buildings of the Municipality XIV of Rome. Both apartments on the ground floor have been declared uninhabitable. 

Here are the planned interventions for the building at Via Flaubert, 56:

  • Pressure washing of the outer perimeter of the building and of the courtyards;
  • Repair of rainwater collection descendant downspouts;
  • Restoration of the bathrooms and kitchens drain pipes;
  • Replacement of 2 boilers;
  • Replacement of fixtures and glass in two apartments;
  • Securing the gas pipeline and replacing of adduction pipe;
  • Shoring of the ceiling affected by the fire;
  • Treatment of fire-affected areas of the basement with specific paint for the containment of particles generated by the flames;
  • Securing the affected area with "orsogril", special grilled panels.

Status

Planning
Tender stage
Site
End of Work

Estimated completion date

Fourth Quarter 2025

Funding source

Roma Capitale Budget

Amount allocated

101.402,88 €